TURBOCAM International

Installation of power and lighting, fire alarm, UPS, and transfer switches for a 70,000 sq. ft. manufacturing facility with two 3000-amp services, cutting edge flywheel UPS, and a 2 megawatt back-up generator.

About This Project

The TURBOCAM International project is a NEW 70,000 sq. ft. manufacturing facility with two 3000 amp service, cutting edge flywheel UPS, and a 2 megawatt back-up generator.
TURBOCAM International
Barrington, NH
$3,200,000
Started in Nov. 2024 with a scheduled completion of Feb. 2026.
Groen Construction
,
,